UK: 0113 276 5060 USA: 423-239-9525
info@thesmilesfoundation.org

Sunset House Cihei

Sunset House, Cihei: Update & Gallery, September 1st, 2022

Sunset House Donate $Sunset House Donate £

As we approach the 6-month mark since agreeing Contracts on the Sunset House, Cihei project, it is becoming easier to understand why this is such an expensive undertaking and just how huge the impact of the facility will be when completed.

It’s been a busy and somewhat pressured month on site, as the Constructors attempted to make up lost time following some earlier delays, especially while the summer dry weather would help in finishing the foundations. The massive job of preparing the Metal Work for foundations continued on just over half the building area.
Sunset House ready for concrete
In an ideal situation, the constructors would have prepared the entire site for pouring concrete rather than this initial section, but that would have required a lot more Shuttering Panels, Timber and Metal Frame Supports. In the interest of controlling the Budget where possible, we agreed to invest a reasonable sum in quality supplies that could be reused once the initial Cement was poured into these frames. Such is the effort on both sides of Smiles and the Constructors to control the Budget.

After so many weeks of preparatory work, the initial plan was to pour Concrete on August 15th but before that could be done, the State Inspectors had to inspect and sign off on all the work to date. Unfortunately, the Inspectors had some concerns which prevented the construction company pouring concrete, and instead they had to first address the issues raised by the Inspectors.

A week of intensive work followed, and a new ‘date to pour’ was scheduled for August 22nd but first an inspection was required to be completed and approval granted. Come August 22nd, everyone was tremendously disappointed when the inspection failed again. Not on particularly ‘major’ issues, but issues that clearly were not to the total satisfaction of the Inspector. Again, more work was necessary to get it ‘absolutely’ right.

I had never seen so many ‘Hi-Visability’ jackets on site. Officials from every concerned interest were on site. Structural Engineers, Site Engineers representing Smiles, the Constructors and the State. All passionately discussing the ‘rights and wrongs’ of the work, what was needing to be done and how best to ensure the third Inspection would be successful.

Engineers on siteAfter another intense week of detailed adjustments to the aligning of metal work, the final inspection was scheduled for August 29th and praise God, this time, all the work was approved. So concrete was booked for Tuesday August 30th and truck after truck started arriving, pouring 144 tonnes of concrete in a day, non-stop from 8am until 5.15pm for the foundations of Sunset House, Cihei.
Concrete pouring

This most significant of stages, in this most exciting of projects, was coming to a close. The foundations, worked on since April 2022 were now being covered 5 months later and the 25 tonnes of steel would never be seen again after being embedded in a total of 1,248 tonnes of concrete. Quite a moment in this incredible undertaking of building Sunset House, Cihei.
Sunset House foundations
As the months tick by, we realise more and more the true size of this project. Exciting for sure but also a tad scarry! When we think of the challenges faced already, we can only anticipate facing many more before the job is done and the facility is built. But equally, we can imagine the impact this facility will have on the Kingdom’s influence in this part of Romania. Many will see another miracle of God and an outpouring of His Love for the people who need help and support, which the Smiles Foundation exists to provide.

Please join us in making this dream a reality.
To support this mission, use the support Tabs or telephone the Smiles office.
Sunset House foundations

Sunset House Donate $Sunset House Donate £

Kevin D. Hoy
Founder and Chief Executive
The Smiles Foundation
kevin@thesmilesfoundation.org


Link to previous Sunset House Reports

Email Newsletters with VerticalResponse