Cihei ‘After-School’ and ‘Out of School’ Project
Throughout its entire Life and Work in Romania, The Smiles Foundation has been dedicated to support and the well-being of Children.
Over the years, many projects have operated – including the Tileagd Community school, Tileagd Kindergarten, Cihei Children’s Centre for Abandoned, Neglected and Abused Children, Gepiu Children’s Centre and hundreds of children within their family unit, yet helped by Smiles with a variety of needs, as basic as food and medicine or as important as clothing and school supplies. Now, all those years of experience are being pulled together for a New Project in Cihei, serving the needs of this rapidly growing community with an ‘After-School’ programme during Term-Time and ‘Out of School’ programmes during the long summer vacations.
An initial Report on the New Smiles Project – ‘Cihei After-School Club’
The Story so far ..…
It was after 3 years of intense, focused Construction of Sunset House and just 3 weeks after the Celebrations of Sunset House being completed, that our faithful Director of Operations, Maria Hava – was wondering … ‘What next?’
When Maria came into my office saying “I’ve been thinking … and dreaming a bit”, I knew I needed to brace myself for something ‘challenging’ – but little did I know, just HOW challenging!
Maria started to share her long held desire, to establish a Children’s Work in Cihei that would impact the fast-growing community around the Smiles HQ, especially the young families and children, with the wonderful Gospel Message of Christ’s Love for them all.
I instantly recalled Maria talking of this ‘dream’ for several years, but as is often the case in Smiles, something else was always on the Planning Board that required all our time, effort and means to fund-raise – and without a doubt, Sunset House had taken all our available resources for a number of years.
It seemed incredible that after such pressure with the Construction of Sunset House, not to mention some other serious issues going on with Upgrades at the Tileagd Complex and an impending move for the Tileagd Nursery after 21 years in its former location – Maria was absolutely convinced ‘NOW was the time to seriously consider the new project for Children ‘Out-of-School’ during vacation time and ‘After-School’ during Term time. She was so convinced she had surprisingly already located a possible property that could house the new Project!!
Adi and I went to see the property with Maria the next day, and whilst it was most appealing in layout and size, it also clearly had some major work needed to be done, especially with the roof, which showed plenty of signs of problems due to large puddles on the interior floors!
However, with a £250,000/$312,500 price tag and an owner who seemed unwilling to negotiate, we concluded this was not the property we could move on, so I thought perhaps, that was the end of the discussion, for now.
But NO – Maria doesn’t let go of a dream quite that easily. I can’t imagine where she learnt that from!!
Days later, another option was being shared, this time, a very interesting option and one that seemed quite recognisable. It was the house next door to where Maria lived!
This looked in much better condition and had two major factors that immediately caught our attention. Firstly, the amount of Land with the Property – twice as much as the first property option and Secondly, the Price!
£200,000/$250,000 which was a tad below market valuation as the owner needed a ‘quick sale’.
One major problem still existed – that was about £200,000 more than we had, as still dealing with Sunset House Debt, the Tileagd Upgrades and the Nursery move, all meant money was tight, to say the least.
Maria being unable to control her excitement, had shared the possibility with some great supporters and some Gifts were already being received ‘designated’ for the ‘New Project’ and a sizeable ‘Interest-Free Loan’ was made available that might just be able to get us started, if the Owner would ‘work with us’ on a payment plan.
Negotiations were swift and helpful, and a plan was agreed to pay on the following schedule:
£20,000 / $25,000 Deposit by January 31st, 2025
£45,000 / $56,250 Instalment by March 31st, 2025
£45,000 / $56,250 Instalment by June 30th, 2025
£45,000 / $56,250 Instalment by September 30th, 2025
£45,000 / $56,250 Instalment by December 31st, 2025
With an Interest-Free loan and over £33,000/$41,250 donations received for the Project by June 2025 – we Praise God all payments due, as per the agreement, were met in full and on time.
Everything felt it was moving along amazingly well. But as we know, when great things are being attempted for God, the devil will try to create problems, and it wasn’t long before we could feel and see the enemies’ efforts.
This was particularly relevant, as the purpose of the Project and the Property was to provide a safe haven for Children when out of School, whether during long vacations or after-school during Term time. The fact is, Authorisation Codes were needing to be met and as we were getting quite use to of late, that included the Fire Department!
We were hoping the process would be a lot more straight forward than we had experienced with the Tileagd Complex upgrades, but even there, we managed it in the end and received our 5-year Licence – so couldn’t be more challenging for this new property … could it?
Everything here looked super. A very clean and well-presented property with lots of potential.

Some initial, yet basic alterations were required, which included Electrics, so we called in our Electrical Contractor to change light fittings, add some extra sockets/outlets and generally check the wiring for the Fire Department Inspection.
It was during that work, the first major concern was discovered, which subsequently led to a nightmare scenario.
As the Electricians broke into the wall, they discovered something they had not seen before – Polystyrene Insulation, normally used on the exterior had been used on the wall of the lounge, obviously for insulation, but polystyrene is highly inflammable, and we were told it would be a complete NO NO by the Fire Department. It was discussed and agreed, the polystyrene would need to be taken down or we would never get approval for a Children’s Project to function.

Whilst the thought was, this can’t possible be throughout the house, we needed to check, so segments of wall were taken from every room, and although hard to believe, every inch of wall had Polystyrene Sheets, insulating the property! A huge shock and beginnings of a big dirty job, as it all had to be removed, back to the brick and re-plastered properly to secure Authorisation. And so it was done, which presented a rather different looking facility, than we had purchased!

The place cleaned up well, but it was a lot of polystyrene that came off the walls!

When things like this happen, it is important to quickly look for the positives. One of our favourite Bible verses is Romans 8: 28 which reminds us: “We know that all things work together for good for those who love God, who are called according to his purpose.”
We soon realised, by now being back to the brick, we could more easily decide on better location of Heating Pipes, Electrical Requirements, Security Camera’s, Air Conditioning Units, most of which hadn’t been installed for a domestic house but was going to be needed for our Planned Project. 20-30 over heated kids in the summer would make any effort required to install Air Conditioning more than worthwhile!
We knew God had great plans for this property and the project that would operate from it, so we looked at how we could make the investment now, while everything was back to basics (or Brick) and not have to mess with a finished decorated facility in a year or two when perhaps more cash would be available, but would then create more mess and disruption. Taking the challenge now, made sense on so many levels, but once again it required FAITH to believe God would provide for all our needs.
SO – additional work was contracted after a full survey of the property, highlighting issues that would need attention in the coming months for Authorisations, and coming years for maintenance and protection of the investment made in the property.
First – a new roof was agreed:

Then New Door and Windows:

New Stairs inside for more even steps and a safer mid-landing which the Authorities would want.

Naturally, all the brick work needed new plaster which was done.
And then the finished Skim plaster, ready to Paint!
All the new Work Budget totalled £44,275 / $55,343 which was indeed, a significant commitment. However, the job when finished, would provide us a beautiful facility to operate the project from, and one that will be fully Authorised by the various State Departments necessary to operate a Children’s Project, as Maria plans.
When the plans were put in place to purchase back in January, we had hoped to be operating from the property for the summer ‘Out of School’ programme. However, with all the additional work required, the summer was taken up with the construction work, but we were able to start the new project using the front house, ground floor, back at the main Smiles HQ Site. The building initially provided the first Smiles Offices in 2001, and it is amazing to see it still fulfilling important tasks, all these years later.
The Ground Floor had been rented out for several years, so some considerable work was required before using it for the summer’s Children’s Project. But all was done internally by our own staff, mainly from the Security/Maintenance team, and they made a very nice job of the facility, which was perfect for the kids all summer, even if at times it was rather hot! But it confirmed for us the plans to install Air Conditioning at the main Property was essential.

This meant we were ready for the Children’s Project to start in Summer 2025 using both this Front House and the Mission Centre – all of which proved perfect for every event we held throughout the month. We were also greatly helped by the visiting Mission teams, who I think had as good a time as the kids! But for sure, the name of Jesus was Praised and Lifted Up, and the Kids asked before leaving, when can we come back!! Fantastic!



So, it looks like everything is perfect and in so many ways, it is. But we need to be conscious of the commitments made and the need that exists to clear debt.
From a total investment to date of around £300,000/$390,000 just £32,829/$42,677 remains to be raised plus the repayment of a £20,000/$26,000 interest free loan to be scheduled.
Maria, and all of us, would ask you to pray for these needs that will provide an amazing opportunity to share the Gospel with the Cihei Community and especially the Children, which will be in full swing this summer and then daily operation from September, for the After-School programme.
Smiles has been operating from Cihei for 25 years and despite so many projects, apart from a few Elderly Luncheons held in the Mission Centre some years ago, we have never established a permanent Project in Cihei for the benefit of the Community.
Maria’s ‘Out-of-School’ and ‘After-School’ Club – Called the Lighthouse – will be a major support to the community, especially for young working parents who face the daily challenge of Child Care and the costs of providing it, in the City. The alternative, as too many parents are forced to do, is leaving their children at home, with no supervision, and trust no harm or accident comes about while young children are alone in the house.
The Smiles Foundation’s newest Project provides a wonderfully safe and affordable option for Parents to consider. And at the same time, children hear of the God who Loves them, has a Plan and Purpose for their lives, and will have enormous fun in the process.
Kevin Hoy
Founder & CEO
August 1st, 2025 and Updated June 1st, 2026