Sunset House, Cihei: Update & Gallery, August 2024
As I started my Smiles main monthly News Update for August: ‘Time Doesn’t Stand Still’! I am becoming increasingly aware of the pressure this fact brings with it, as the clock is most certainly ‘ticking’ for the Sunset House, Cihei Project. As of today (August 1st), we have 72 days before the Grand Official Opening when the real Celebrations and Thanksgiving begins.
Those who keep up with the reports I post each month will know, leaks in the huge roof of Sunset House have been a constant frustration in trying to seal the building and getting it truly, watertight. This has been a challenge we have revisited many times realising where water comes out, is not necessarily, where it comes in!
Many workmen have tried to solve the problem, and following a heavy downpour of rain recently, and with it remaining completely dry inside, we are trusting the problem has finally been solved.
I was delighted to report last month that the Flooring Team arrived in Cihei on June 6th. They set to work immediately and certainly worked extraordinarily long days to achieve so much in the 10 days the team of 5 were here. On leaving, we all hoped they would be back in early July to finish the job, but their schedule back home has stretched that to not making it back until 4am on July 30th!
Leading a team of 4 this time, Derek set to work Tuesday morning and hopes to truly ‘finish’ the job in less than a week. I pray they are right in their assessment, as so much awaits on the flooring to be finished, so subsequent work can start.
On that matter, if any plumber would be able to come for a week in August and help us fit all the toilets that have been waiting months for the floor to be finished, they now need installing. Quite a job, as we have about 40 of them, but we are all ready for you. Toilets are purchased and just waiting to be connected to water fill and soil pipes.
If you can help, write to me or call the office so we can make plans from August 10th.
As reported last month, Derek had brought over our new Generator for Sunset House.
Our Electrical Contractor responsible for the new Transformer had been waiting on the Generator, so was keen to get it in position as quickly as possible. At over 4 tonnes, it was another crane hire to get it in position. But it looks good in place and is now being used to provide us electricity while the new Transformer is installed.
Another job that has been challenging us for a while, was cleaning the upper windows around the entire building. We obtained quotations for a company to do the job and was surprised at the quote of nearly £1,000/$1,250. A job that needs to be considered at least twice a year presented me with an economic challenge appearing to need quite a budget to keep the windows clean.
I found a company in Oradea that would rent us an Electric Working Platform and then we could try doing the job ourselves. I took the risk and invested £400/$500 to rent it for a week. Cornel was brave enough to venture up high and much of the job was done and we were completely satisfied with the finished appearance. Having looked at such dirty windows for over a year, it was great to see through them clearly and appreciate just how nice they all are.
I’m still working on the sums for this. Renting the machine and doing the job ourselves is clearly better than contracting with a Cleaning Company. Seeing how versatile and useful this Working Platform could be on all Smiles Projects with upper floors and even Roof Work, has got me wondering if fully investing in a new machine would be worthwhile. That would cost us £10,800/$13,500 but would be a great piece of kit to have available whenever needed. We shall see. Meanwhile, I am thrilled to have clean windows in Sunset House, and we will need the machine again in September for a final clean before the Grand Opening.
I also have to say what a tremendous job our many Mission Teams did this summer with cleaning windows, inside and out, wherever they could reach. Sometimes, even beyond their reach!
Another major job, started back in April with John Montgomery, was the Sensory Room installation. You may recall, one piece of equipment was faulty, so John ordered a replacement from Holland and made plans to return to Romania to fit it. John arrived July 7th and in a couple of days, the Room was indeed, completely finished. John then held a day of Training for our Residential Staff in preparation for using the new equipment and then – so typically, John asked what else needed doing? He then put his electrical skills to good use and fitted several exterior lights which was a joy to see completed. Thank you, John.

For some time now, plans have been formulating on the exterior grounds, landscaping and gardens which in the absence of a professional landscaper being able to come, I had to resort to plans of my own, but thankfully, I had some amazing teams to help with the hard graft of digging, laying top soil, planting trees, bushes and lots of other detailed jobs to make the exterior appearance of Sunset House as welcoming and beautiful as inside.
With 15 major trees planted back in April which have all taken well – for two months now we have focused on landscaping and planting the more immediate gardens. They are not finished yet, but tremendous progress has been made and as someone said to me only yesterday, Sunset House is starting to look rather special!

Then of course, we have worked this past month on the North Gardens in front of the Big Lounge and Terrace patio, which is also looking rather special!

Then 7 wonderful ladies from Northern Ireland, here for a week of Mission, provided the top soil!
Maybe the next team can help us Plant more Shrubs and get benches in place to finish the Garden!
There is still a lot to be done and considerable costs to be met, and time is getting less and less. However, people continue to be very supportive and generous towards the needs of Sunset House and at this stage of the project, several costs arise that were not specifically planned for, but just have to be done.
I want to reiterate my appreciation to the Smiles Family, for their response to the great needs we face to fulfil the ministry, especially when such large commitments exist around Sunset House.
But we give Praise to God that in the past month, we saw further support for Sunset House of £25,142/$31,427 which takes us to within 5.6% of the Financial Finish Line.
Less than 3 years ago, we were anticipating a budget cost of 2.5 – 3 million for Sunset House. We now face a final amount to be raised, of £154,176 / $192,720.
We pray, God Willing, this amount will be met by the time the Facility is due to be finished and we celebrate the Grand Opening on October 12th & 13th, 2024.
I continue to Praise God and sincerely thank you for your amazing interest and support for this incredible project.
Please continue praying for and supporting Sunset House, by every means you can.
Sincere blessings in the Lord’s Service.
Kevin D. Hoy
Founder and Chief Executive
The Smiles Foundation